Sunday, July 21, 2013

Room-by-Room List

So it seems that one of my failed 2012 and current 2013 resolutions had already been done.  I was suppose to do a room-by-room list of tasks we want to complete.  Based on what's on the list, I believe I did this about the time we bought the house.  We get to see our 22 month progress now though.  The items in black are original (2011), blue are new (2013), and slashed are done, and green slashed have links to the finished project.

EXTERIOR:
Replace front landscaping 
Replace front post
Add grass
Spray paint chain link fence
Add another parking pad
Planting along parking fence
Paint front porch
Bench on front porch
Paint house

Hide AC
Block crawlspace opening
Add plants to side yards
Add pebbles along north side
Add rubber pads for dumpster

Paint patio
Add furniture to patio
Add firepit to back yard
Remove brick flower bed
Resod backyard
Replace back fencing
Add surround to large tree
Replace shed

LIVING ROOM:
Replace front door
Replace closet door
Hang curtains
Add overhead light over dining table
Add side lamp by tv
Replace AC air handler
Fix ceiling issue
Stain scratches in ceiling
Paint walls
Change opening to kitchen
Fix outlets
Add chair?
New floor?
Add stone accent wall behind tv

KITCHEN:
New floor
New cabinets
New appliances
Add backsplash
New lighting
Paint walls
Replace exterior door
Replace pantry door
Replace office door?

HALL BATHROOM:
Replace vanity, toilet & shower
New floors
New lighting
Remove storage
New drywall/tile
Replace bathroom door?
Add storage
Replace shower curtain

GUEST BEDROOMS:
Add doorway in hall
Remove doorway between rooms
Replace carpet
Replace lighting and ceiling fan
Add daybed to small guest
Add curtains
Paint walls
Replace blinds

OFFICE:
Add chairs
Replace tile
Remodel walk in closet
Paint walls
Add curtains
Add art
New lighting

LAUNDRY:
Replace floor
Add AC opening
New washer and dryer
Surround water heater
Replace backdoor
Replace door to office
Add wood blinds
New lighting

MASTER SUITE:
New floors
New lighting
Renovate bathroom
  New sink/vanity, toilet & shower
  New floors
  New vanity
  New lighting
  Add lighting
  Add ventilation
Remodel closet

While we have made some progress, it looks like there's a lot left to do.  Hopefully, in the next couple of months we can knock a couple more of these off this list. 

0 comments:

Post a Comment