The Demolition:
I started with some of the demo before my parents arrived. We had storage built in behind the door, that was original to the house. I found them a little bulky, and not necessary. Here's a picture after the doors were removed.Three hours later or so, and I ended up with this. I was pretty proud of myself. I had been itching to demo something, and this was the good scratch.
My parents, Nick and I worked on the demo of the floor, and the removal of the toilet and vanity. We were left with a nice, clean slate to work with.
The Rebuild:
The rebuild required leveling of the floor, fixing the drywall behind the old storage, and laying the tile.
We chose a tile that looked like fabric, and I love it. Next part of the rebuild was to add the toilet and sink. I chose the pedestal sink because it was the one option that would fit properly with the door swinging open.
I painted the bathroom again, Wheat Bread by Behr. We still need to finish the storage, install the tp holder and trim.
The Details:
I am on the lookout for a new mirror, and artwork.AFI Top 100 Update: We watched #54 M*A*S*H with my parents, and #41 King Kong, on March 2nd to commemorate it's 80th anniversary. 10 down, 90 to go.
0 comments:
Post a Comment