We have ripped out cabinets, and flooring! It's back breaking work, but we are trying to get as much done before my parents arrive to help.
Can't wait to be done with this reno.
PS. No Pinning and Pining this month because of the big reno! March is a busy month for us. Hopefully it will be back in April.
Sunday, March 16, 2014
Sunday, March 2, 2014
Removing Trim
This weekend, I cleaned up some of the landscaping. It has been neglected for some time now. I looks much better, but still needs another weekend of work.
I also worked on ripping out some trim for the kitchen reno. It needs to be done, but I hate it. The flippers that sold us the house added texture to the wall, and just taped around the trim, flooring and cabinets. It was not done well either. I can see in every room, where the texture is on the trim. This along with, what appears to be 10 layers of paint and 2 layers of caulk, makes ripping out trip back breaking. I was able to get the little hallway off the kitchen done Sunday afternoon.
I hope to get more trim removed throughout the week.
PS. Sorry, no post next week. Nick and I will be in San Antonio, for his sister's wedding.
I also worked on ripping out some trim for the kitchen reno. It needs to be done, but I hate it. The flippers that sold us the house added texture to the wall, and just taped around the trim, flooring and cabinets. It was not done well either. I can see in every room, where the texture is on the trim. This along with, what appears to be 10 layers of paint and 2 layers of caulk, makes ripping out trip back breaking. I was able to get the little hallway off the kitchen done Sunday afternoon.
I hope to get more trim removed throughout the week.
PS. Sorry, no post next week. Nick and I will be in San Antonio, for his sister's wedding.
Subscribe to:
Posts (Atom)